BeltWatch™ Belt Alignment Rip and Tear
Non Contact – High Speed
Laser-based Detection System
BeltWatch™ BART
- Belt Alignment, Rip and Tear
- BeltWatch™ is a non-contact laser-based system:
Detection and Tripping System
- RIP (loose hanging attached piece of the conveyor)
- TEAR (longitudinal cut in conveyor)
- ALIGNMENT (conveyor tracking)
- HOLE (missing area in conveyor)
Works on
- Longitudinal Tears
- Side Tears
- Belt Rips / Loose Hanging Flaps
- Oversize Material
- Misalignment
- Holes in Belt
- Trough and Return Belts detection
Enhanced Features Include
- Live footage camera
- HMI / Configurator
- PLC Field Bus Integration
- Automated Sensor Testing
Your Complete Conveyor Belt Monitoring and Protection System
Normal mining activities bring about the risk of hard rock/metal objects being trapped at transfer points causing longitudinal slitting or edge damage (tears) as well as surface breaches (rips/holes) in conveyor belts.
This damage
Danger to human safety- Consequential damage
- Damage to ancillary equipment
- Structural damages
- Expensive repair costs
- Production losses occur due to long repair times
- Production losses due to long repair times
[wpdatatable id=4]
Additional BELTWATCH features
- Statistical Information captured to assist the Mechanical maintenance personnel to detect deterioration of the conveyor as a whole (Preventative Maintenance Indicator)
- Monitoring for smaller rips (holes) in
conveyor belt - Monitoring of belt edge
rips / tears - Monitoring of belt alignment on Top AND Return conveyor belts
Easy customized timing (per Sensor) and sensitivity adjustment byauthorised personnelEasy integrates into your existing PLC / SCADA / Network systems- Oversize material detection
- Hanging flap rip detection
- Snapped Belt detection
- 7 Inch Colour Touch Screen Interface (Optional)
- Ethernet Camera Integration (Optional)
- Feeder Start/Stop Control using Hole detection (Optional)
Testimonial
After a tear on one of our overland conveyors from the tail to the head (in excess of 1500m)
taking 4 days to repair and
impact conveyors at Modikwa mine